Each program can contain multiple operations. An operation contains all of the information established on the Task side of Robotmaster, in addition to settings specific to robot control.
General
Content
Integrations
Each program can contain multiple operations. An operation contains all of the information established on the Task side of Robotmaster, in addition to settings specific to robot control.